Quantity Takeoff

Depending on the shape or design of a building the method of taking out quantities also varies. Here, I describe the more common methods of taking out quantities in the construction field.

Long wall & short wall method

Also called as general method, separate method, out-to-out & in-to-in method or individual wall method. This method is especially applicable for the works such as foundation, excavation & foundation concrete. This method is described as follows,

  • First, find out the lengthy wall (they are the long wall and wall perpendicular to that is short wall).
  • Then find the measurements of external length of lengthy wall (that is out-to-out) and internal length of short wall (in-to-in) and height of the wall.
  • Finally multiply them to find out the necessary quantity, long wall (out-to-out) OR short wall (in-to-in) X breadth of wall X height.

In the given below diagram, the green coloured layers are long walls and other layers represent the short walls. The “arrow mark” on the green layer shows how the length of a long wall should be measured (out-to-out) and the “arrow mark” on the other layer shows, how a short wall should be measured (in-to-in).

Methods of takeoff quantities – Explanation with solved problem (1)

Here is the short cut for you

Long wall (out-to-out) = c/c length + 1/2 breadth on one side + 1/2 breadth on the other side

= c/c length + one breadth.

Short wall length in-to-in = c/c length – 1/2 breadth on one side – 1/2 breadth on the other side

= c/c length – one breadth.

Additional info:

Length of long wall measurement decreases while length of short wall measurement increases, when notice the measurements from foundation to super structure.

Example.

Methods of takeoff quantities – Explanation with solved problem (2)

Calculate the quantity of excavation for the given plan using long wall – short wall method?

Methods of takeoff quantities – Explanation with solved problem (3)

Centreline Method

This is another method of taking out quantities for construction estimation. This method is easy or quick as to calculate even from work site. But the method is more suitable if the offsets of the building are symmetrical. The center line act as “length” for calculation of an estimate by this method. Here, the center line is multiplied by breadth and the height to take out the necessary quantity (center line X breadth of wall X height). But the calculations should be carefully noticed in junctions or cross walls such as L, T or +.

Methods of takeoff quantities – Explanation with solved problem (4)

Here, the green coloured area will be calculated twice when takeoff quantity. So the green coloured area should be deducted once from the measurement when takeoff quantity.

Methods of takeoff quantities – Explanation with solved problem (5)

Here the green coloured area will be calculated twice when takeoff quantity. But the measurement of blue coloured area will not be included in any instance such as when calculate the measurement of yellow coloured area or when calculate the silver coloured area. So there is o need to add or deduct anything to the measurement when takeoff quantity.

Methods of takeoff quantities – Explanation with solved problem (6)

Here, the green coloured area will be calculated twice when takeoff quantity. So the green coloured area should be deducted once from the measurement when takeoff quantity.

Short cut and additional info

“ L “ Junction – There is no need to deduct from total centreline length.

“ T “ Junction – Half (1/2) breadth wall measurement should be deducted for a T junction.

“ + “ walls / cross walls – Wall breath measurement should be deducted to the total length of centreline.

Example:

Methods of takeoff quantities – Explanation with solved problem (7)

Calculate the quantity of excavation for the given plan using centreline method?

Methods of takeoff quantities – Explanation with solved problem (8)

Comments

comments

About The Author

Methods of takeoff quantities – Explanation with solved problem (12)

Methods of takeoff quantities – Explanation with solved problem (2024)

FAQs

What are the methods of quantity takeoff? ›

You have two main material takeoff options. The first is using the old and antiquated manual method. The other is using a modern and more accurate digital takeoff system.

What are the various methods of taking out quantities explain any one? ›

The quantities like earth work, foundation concrete, brickwork in plinth and super structure etc., can be workout by any of following two methods: Long wall - short wall method. Centre line method. Partly centre line and short wall method.

What is an example of a quantity takeoff? ›

Example:For a commercial building project, assembly quantity takeoff might involve quantifying assemblies like: Exterior wall systems (including framing, insulation, cladding) Floor systems (including concrete, structural steel, decking) HVAC systems (including ductwork, units, controls)

How do you take off quantities using digital methodology? ›

Digital Quantity Takeoff

With a digital QTO, you simply scan the blueprint into the software to analyze it and create a precise list of all materials required for the project. Then, you can assign automated, error-free formulas to the materials and run them through the software to get accurate construction take-offs.

What skills do quantity surveyors need? ›

You'll need:
  • maths knowledge.
  • to be thorough and pay attention to detail.
  • analytical thinking skills.
  • knowledge of engineering science and technology.
  • persistence and determination.
  • knowledge of building and construction.
  • the ability to use your initiative.
  • thinking and reasoning skills.

What is the difference between material takeoff and quantity takeoff? ›

Material takeoff focuses specifically on determining the quantities and types of materials required for a construction project. Quantity takeoff, on the other hand, involves estimating the quantities of all project components, including labor, equipment, and materials, to calculate costs and develop project schedules.

What is the purpose of taking off quantities? ›

Quantity take-offs (QTO) are a detailed measurement of materials and labor needed to complete a construction project. They are developed by an estimator during the pre-construction phase. This process includes breaking the project down into smaller and more manageable units that are easier to measure or estimate.

Which method is easiest for the estimation of the quantity of material? ›

1. Centre Line Method: Centre line method is applicable to the square building with symmetrical offsets. To calculate the quantities of materials, you need to multiply the total centre line length with breadth and depth of the construction.

What is quantitative Takeoff? ›

In construction, a quantity takeoff is a list of all the physical materials necessary to complete a job and their costs. It does not consider labor costs, permits, overheads, equipment, or other incidentals.

What is the difference between quantity takeoff and BOQ? ›

1. Quantity/Material Takeoff Sheet (MTO): a list of materials with quantities and types required to build a structure. 2. Bill of Quantities (BOQ): a detailed statement of work, prices, and dimensions, required to build a structure.

What is the difference between a quantity takeoff and a full estimate? ›

Takeoffs don't include any material costs associated with them or extra costs that an estimate will have. In contrast, an estimate takes the takeoff a few steps further. Estimates apply costs to all the materials determined by the takeoff and add in other costs the contractor will face.

What are the quantity takeoff methods? ›

Quantity Take-Off Methods require detailed measurements of a building's components, materials, and construction labor to determine a scope of work required and a cost estimate of the construction project.

How to do a take off quantity surveying? ›

Preparing a quantity takeoff involves converting blueprints into data or taking off quantities from drawings. It begins with counting the materials the project needs and converting them into a cost, which is then used in creating a quote or it can be used to calculate the project's budget.

What is material take off methodology? ›

Material takeoff involves the systematic process of quantifying and listing all the materials required for a construction project based on architectural drawings and specifications.

What are the different modes of measurement of quantities? ›

The nominal, ordinal, interval, and ratio scales are the four types of measurement scales.

What is the method of quantity estimate? ›

Detailed estimates provide the most accurate costs. 3. Common methods to estimate quantities are the long wall-short wall method and center line method. The center line method uses total wall lengths and is quicker and more accurate.

What is quantitative takeoff? ›

In construction, a quantity takeoff is a list of all the physical materials necessary to complete a job and their costs. It does not consider labor costs, permits, overheads, equipment, or other incidentals.

What are quantity take off units? ›

Although there are 5 basic categories of units when preparing a detailed estimate, takeoff items are always recorded in terms of three units of measurement: length, width and height. Furthermore, each description for an item of work in a quantity takeoff needs to be detailed enough for the estimator to price the work.

Top Articles
Latest Posts
Article information

Author: Edmund Hettinger DC

Last Updated:

Views: 6334

Rating: 4.8 / 5 (78 voted)

Reviews: 93% of readers found this page helpful

Author information

Name: Edmund Hettinger DC

Birthday: 1994-08-17

Address: 2033 Gerhold Pine, Port Jocelyn, VA 12101-5654

Phone: +8524399971620

Job: Central Manufacturing Supervisor

Hobby: Jogging, Metalworking, Tai chi, Shopping, Puzzles, Rock climbing, Crocheting

Introduction: My name is Edmund Hettinger DC, I am a adventurous, colorful, gifted, determined, precious, open, colorful person who loves writing and wants to share my knowledge and understanding with you.